1.0 | Piling Load Tests-State Street, I-29 IDOT and Salt River ADOT
2.0-3.5 | Bond Testing & Pull Out & Compressive Strength Testing
4.0-4.12 | Caltrans Test & Control Piles For Matrix Slurry System
5.0 | Mixing & Handling Procedures Matrix Synthetic Slurry System
6.0-6.4 | Methods To Confirm Formula of Matrix Synthetic Slurry System
7.0 | Product Disposal Guidelines
8.0 | SDS Forms Matrix Synthetic Slurry System Products
1.0 | Piling Load Tests-State Street, I-29 IDOT and Salt River ADOT
State Street
1.1 Log of Test Borings - State Street
1.2 Load Test Method - State Street
1.3 Predicted Capacity - State Street
Predicted Capacity From Load Test
Load Test Report
1.4 Details of Pile Design - State Street
1.5 Construction Methods Used - State Street
Concrete Mix Design
Method Statement
1.6 Results of Slurry Tests - State Street
1.7 Procedure for Mixing Slurry - State Street
Slurry Mixing & Handling Procedures
Photos
Download all 1.1-1.7 Documents - State Street
I-29 IDOT
1.1 Log of Test Borings - I-29 IDOT
Soil Boring Location Diagram
1.2 Load Test Method - I-29 IDOT
I-29 IDOT Report
1.3 Predicted Capacity - I-29 IDOT
Predicted Capacity From Load Test
Load Test Report
1.4 Details of Pile Design - I-29 IDOT
Installation Procedures
1.5 Construction Methods Used - I-29 IDOT
Concrete Mix Design
Method Statement
1.6 Results of Slurry Tests - I-29 IDOT
Test Report 1
Test Report 2
1.7 Procedure for Mixing Slurry - I-29 IDOT